Changing Datasets and impacted drill paths

I realize that drill paths have the ablilty to access different datasets. That is really cool and beneficial. However, we are currently faced with a change to a dataset and a bunch of cards that the parent and child card are all the same dataset and need to be changed to the new dataset. I now need to reassign at parent level and every drill level for these cards. I'm sure there are better uses for my time.
Comments
-
-
Would love to see this feature be added, we're looking at migrating roughly 500 cards that all have drill paths, and though we can mass update the top level, it would be nice to be able to seamlessly do the drill paths as well.
0 -
Did this feature ever come out? The ability to have drill cards update when the card is moved to a new dataset? Would be huge for us.
0
Categories
- 10.8K All Categories
- 3 Private Company Board
- 1 APAC User Group
- 12 Welcome
- 39 Domo News
- 9.7K Using Domo
- 1.9K Dataflows
- 2.5K Card Building
- 2.2K Ideas Exchange
- 1.2K Connectors
- 344 Workbench
- 260 Domo Best Practices
- 11 Domo Certification
- 467 Domo Developer
- 50 Domo Everywhere
- 106 Apps
- 717 New to Domo
- 85 Dojo
- Domopalooza
- 1.1K 日本支部
- 4 道場-日本支部へようこそ
- 27 お知らせ
- 64 Kowaza
- 299 仲間に相談
- 654 ひらめき共有