Change Data Source- Option To Switch Drill Path Cards

Would be nice to have the option to switch the drill path cards' data source, if the main card has its data source changed. A few times I had to change entire dashboards to another data source. Each card on the dashboard had multiple drill levels . This always takes a good ammount of time to get it all straightened out.

_________________________________________
Daniel Nicholas Lefteriou
Wentworth Institute of Technology

_________________________________________
6
6 votes

Β· Last Updated

Comments

  • Seuss_PhD
    Seuss_PhD βšͺ️

    Thank you for your suggestion. Β This has been submitted to our engineering team through ticket DOMO-43017.

  • product_John
    product_John βšͺ️

    @Gavatar can you take a look at this please?

  • You can change the drill path data source. When you are building the drill path look at the dataset dropdown in the top left corner. You can change the dataset from that dropdown. This is a powerful feature as you said. It is certainly powerful and needs to be used carefully so the user is not confused when they drill.

This discussion has been closed.